Friday 26 April 2024

In 3 Months, 47 Train Level Crossings Damage, 9 Destroyed

The MOPT began in December 2018 a program to install trail level crossings at 91 intersections in the greater metropolitan area of San Jose

Paying the bills

Latest

Foods high in calories, sugar and fat will have to include a front label

QCOSTARICA -- For consumers to have clear information about...

San Jose Airport speeds up departures and arrivals of tourists in less than an hour

QCOSTARICA -- A series of recent changes carried out...

Shortage of available hospital beds back home strands Canadian in Costa Rica

QCOSTARICA  - Suffering a medical emergency, whether it be...

The Changes in the 6 months before death symptoms- Both Physical and Emotional

Individuals and their families embark on a dramatic journey...

What occurs once your nation operates on 99 percent renewable energy?

Q24N (The Verge) While most of the world still...

How relocating from the U.S. to Costa Rica’s ‘blue zone’ totally changed this family’s life forever

QCOSTARICA (CTV) When Kema Ward-Hopper and her then-fiance Nicholas...

Dollar Exchange

¢499.75 BUY

¢504.88 SELL

26 April 2024 - At The Banks - Source: BCCR

Paying the bills

Share

It’s been three months since the Ministerio de Obras Públicas y Transportes (MOPT) – transport ministry – began installing train level crossings in the Greater Metropolitan Area (GAM) of San Jose. And it’s been three months that drivers have had a new target to collide with.

The MOPT began in December 2018 a program to install trail level crossings at 91 intersections in the greater metropolitan area of San Jose. To date, only 74 have been installed, of which 47 have been damaged and 9 completely destroyed

In December, the MOPT installed level crossings on the first 23 intersections, part of their plan to install 91.

But due to problems like drivers running into the “Aguas”, the MOPT has only been able to install 74, of which, so far 47 have been damaged and another 9 completely destroyed, according to the MOPT.

- Advertisement -

“With the start of operations in December, we established a work plan to progressively put in service the devices at 91 intersections; However, the attention of the systems that we have activated up to now, some 74, demand a great amount of time and resources, delaying the progress of the entire project,” explained the head of the Department of Traffic Lights, Diego Rugama.

If that weren’t enough, the MOPT has run into other problems with the trail level crossings.

The MOPT reports, in addition to the aforementioned damages, it has to replace some 519 linear meters of cable, 22 control caps, 41 train detectors and 52 concrete protectors for train detectors, all due to theft.

“The most complicated thing is that the most significant damage has been made to devices that have no use in the black market, because they are highly specialized equipment that has no value than what they are used for in these systems … they are very valuable parts for the system but useless for other things,” added Rugama.

About the only thing the MOPT and the Incofer – the railway – can do is to call on all citizens to report to the 911 emergency line any suspicious situations or vandalism.

The hope, according to Rugama, is that with more reports it will, in turn, decrease the number of incidents.

- Advertisement -

 

- Advertisement -
Paying the bills
Rico
Ricohttp://www.theqmedia.com
"Rico" is the crazy mind behind the Q media websites, a series of online magazines where everything is Q! In these times of new normal, stay at home. Stay safe. Stay healthy.

Related Articles

Shortage of available hospital beds back home strands Canadian in Costa Rica

QCOSTARICA  - Suffering a medical emergency, whether it be something from...

Uber Moto is getting ready to start in Costa Rica

QCOSTARICA -- Savings and speed versus road safety. Without efficient public...

Subscribe to our stories

To be updated with all the latest news, offers and special announcements.

Discover more from Q COSTA RICA

Subscribe now to keep reading and get access to the full archive.

Continue reading